Applications for 2027 wet season percolation testing are being accepted now through Jan. 15, 2027.
If your property can’t connect to the public sewer, you need a septic system, also known as an on-site sewage disposal system.
Our office must first test your soil to see if it is suitable. This is often called a “perc test.”
State rules require these tests to be done during the “wet season” (usually February-April) when the groundwater is highest. This ensures your septic system will work correctly all year.
Application Deadline: Jan. 15, 2027
We will return incomplete applications and will not consider late submissions for the 2027 testing season.
Testing schedules depend on the weather. If groundwater levels drop too low, we will pause testing until they rise back to the required range.
How to Apply
Application forms are available from the Environmental Health office.
Call 410-228-1167, email DCHD.Environmental@Maryland.Gov, or stop by the office at 627 Race St., Cambridge.
We schedule tests in the order we get complete applications.
A complete application must include all four of the following:
- Application Form: A completed Soil Evaluation Application.
- Preliminary Soil Report: A report from a qualified soil consultant that maps out and describes the exact area chosen for your septic system. This report must include details about the groundwater monitoring wells that your consultant installs on the site so the Environmental Health office can evaluate the water table.
- Property Deed: A copy of your property deed (not needed if you are subdividing land).
- Payment: The required fee for the soil test.
Important Information
You must hire a qualified soil consultant to mark the proposed area for your septic system, install the required monitoring wells, and submit a preliminary soil report.
Questions?
Call the Environmental Health office at 410-228-1167.